This was a greenfield site which was situated on a man made embankment which we had to carry out detailed geotechnical design on to ensure that the ground could take the loading from the generation plant
A number of existing services and easements were present across the site which we proved using ground penetrating radar and trial pitting to establish a safe system of work and to enable construction of the site in accordance with the requirements of the end customer.