Langage STOR

5MW capacity reserve power facility exporting to the grid (WPD) at 11kV.

Our works involved the civil & structural design and build of all of the foundations for the site including construction of an access road, fencing, ducting, drainage and footpaths. This was a greenfield site which was situated on a man made embankment which we had to carry out detailed geotechnical design on to ensure that the ground could take the loading from the generation plant

A number of existing services and easements were present across the site which we proved using ground penetrating radar and trial pitting to establish a safe system of work and to enable construction of the site in accordance with the requirements of the end customer.

Blue Back IconBack to Case Studies

Another project designed & delivered in partnership with EPS Construction working as main contractor. All arisings were reused on site and 100% of our waste was recycled.

Would you like more information?

If you need any assistance with site clearance, earthworks, ground improvement, foundations, ducting, drainage, process pipework, kerbing, slabbing or fencing for your project or if you would simply like to find out more about the sort of work we do then please contact us.

GET IN TOUCH