CONTACT

Sector:

STOR Power Generation

Location

Holditch

Date completed:

2019
Blue Dots

Holditch STOR

Our works involved the civil & structural design and build of a number of new concrete plinths to support the re powering of a section of the site from 26nr 500kw diesel generators to 14 nr 1MW gas powered generators.

Working within the confines of the existing generation site we undertook the demolition of 26 nr reinforced concrete plinths using robotic demolition and extraction of the arisings using a conveyor belt system prior to ground reprofiling and construction of the new reinforced concrete plinths.

 

100% of waste generated on this project was recycled and processed in the immediate local area.
Blue Back IconBack to Case Studies

14 MW STOR Re Powering

Demolition & Concreting

Demolition & Concreting